Call(224) 505-4955Tell us about your project

The Cardea approach

The remodeling process.Find the conflicts before construction does.

Read the room, define the work, resolve dimensions and access, then carry those decisions through construction. Existing conditions belong in the plan before materials are ordered.

Start with your room
Opened wall with a vertical cast-iron drain stack, copper supply lines, wood studs, and adjoining masonry.

The working sequence

Do not ask construction to solve a planning problem.

The outline below describes Cardea's intended project path. Exact responsibilities and deliverables are confirmed for each project before work begins.

Read the room

Start with the failure, not the finish.

Name what gets in the way now, who uses the room, what stays, what moves, and what the rest of the house asks of it.

Add the address, building type, access, occupancy, timing, and known conditions before assuming the project is straightforward.

Kitchen elevation and floor-plan sheets on an oak worktable beside a pencil and a scale ruler.
Purpose of the phase

A clear account of the problem and the property around it.

Set the scope

Draw a line around the work.

Connect the layout to existing conditions, systems, approvals, cabinetry, fixtures, lighting, finishes, and the limits of what will change.

Identify decisions that affect several trades before they become field questions.

Empty room with tall windows and a kitchen island footprint marked in blue tape on protected flooring.
Purpose of the phase

A defined room, a defined boundary, and fewer hidden assumptions.

Prepare the work

Resolve what the field should not have to guess.

Confirm dimensions, access, long-lead decisions, material relationships, inspection points, and the order in which the room has to come apart and go back together.

Leave room for real field conditions without making improvisation the planning method.

Marble, oak, painted cabinet, nickel, and tile samples resting on overlapping drawings beside a window.
Purpose of the phase

A construction sequence supported by the decisions already made.

Build and close

Carry the plan through the last edge.

Keep the scope visible as work progresses, address discovered conditions directly, and protect the relationships between trades and finishes.

Review operation, alignment, light, hardware, transitions, and remaining details against the agreed work.

Renovation hallway with taped floor protection, a temporary dust barrier, paneled walls, and a timber stair.
Purpose of the phase

A completed room that can return to daily use.

The first step

Tell us where the room gets in your way.

Send the address, the room, what is not working, and the scale of change you are considering. That is enough to begin the right conversation.

Start the inquiry

Choose the room

Kitchen and bathroom work place different demands on layout, systems, materials, access, and the people living through construction.